• Australian Standard Link Chain. Long Link Chain
  • Australian Standard Link Chain. Long Link Chain
  • Australian Standard Link Chain. Long Link Chain
  • Australian Standard Link Chain. Long Link Chain
  • Australian Standard Link Chain. Long Link Chain
  • Australian Standard Link Chain. Long Link Chain

Australian Standard Link Chain. Long Link Chain

Usage: Drag Chain
Material: Iron
Surface Treatment: Electroplating
Feature: Heat Resistant
Chain Size: as Per Your Requirement
Structure: Welded Chain
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
MAR-12
Color
as Per Your Requirement
Material.
Steel
Size.
as Per Your Requirement
Color.
as Per Your Requirement
Finish
HDG
Packing.
Packed in Sacks, Wind Wheel, Plastic Drum, Drum, W
Transport Package
Wooden Boxes, Cartons
Specification
SGS
Trademark
MARINK
Origin
China
Production Capacity
1000PCS/Month

Product Description

Australian Standard Link Chain. Long Link Chain
Australian Standard Link Chain. Long Link Chain
Australian Standard Link Chain. Long Link Chain
Australian Standard Link Chain. Long Link Chain
Australian Standard Link Chain. Long Link Chain
Australian Standard Link Chain. Long Link Chain


Australian standard link chain
III.LONG LINK CHAIN
CHAIN SIZE WORKING LOAD LINK DIMENSION LINKS PER M LENGTH PER 100KG
S R F B.F. H.D.G.
MM MT MM MM MM PC M M
5 0.19 5.00 29.3 21.8 34.1 217.0 206.0
6 0.32 6.30 34.5 26.1 29.0 135.0 128.0
8 0.53 8.00 41.2 31.9 24.3 82.2 78.1
10 0.83 10.00 49.0 38.7 20.4 52.9 50.2
 
IV.GRADE70 CHAIN

CHAIN
SIZE

LINK DIMENSION

WEIGHT
PER M

WEGHT
PER 500KG

WEGHT
PER 50KG

BREAKING
STRENGTH

S
R F
MM MM MM MM KG KG KG KN
6 6.3 18.9 22.05 0.88 568 56.8 44.1
7 7.1 21.3 24.85 1.12 446 44.6 55.9
7.3 7.3 24.0 26.6 1.16 430 43.0 58.9
8 8.0 24.0 28.0 1.43 350 35.0 73.6
10 10.0 30.0 35.0 2.23 224 22.4 118.0
13 13.0 39.0 45.5 3.75 133 13.3 176.0

Material: carbon steel Q235, 20 mn2 alloy
surface treatment: primary colors, electricity galvanized, hot galvanized, black, plastic spraying and dip coating, etc.
Packing: packed in sacks, wind wheel, plastic drum, drum, wooden boxes, cartons, such as playing Tito
delivery: 35-40 days after place the order

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2010

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory & Trading Company
Number of Employees
20
Year of Establishment
2010-01-08